Voted on separately
$1.11M

Awards Redgwick $1.11M to replace turf at ICS-TCN Cesar Chavez

Redgwick Construction will install synthetic turf and do the demolition, grading and drainage work to prepare the site at ICS-TCN Cesar Chavez. The price includes a $150,000 contingency, and Redgwick was the lowest responsible bidder. Work is expected from August 14 to November 12, 2025.

Plain-English summary written by AI from the official text. AI summary · amounts checked against official text

Pulled from the consent vote. Adopted in its own vote at this meeting (6–0, 1 abstaining), instead of with the rest of the consent report.

· Adopted (passed). A motion was made by Director Latta, seconded by Director Thompson, that this Agreement Between Owner and Contractor by and between the District and Redgwick Construction Company, Oakland, CA, be Adopted. The motion carried by the following vote:.

  • Maximus Simmons Absent
  • Marianna Smith Absent
  • Rachel Latta Aye
  • VanCedric Williams Aye
  • Mike Hutchinson Abstained
  • Patrice Berry Aye
  • Clifford Thompson Aye
  • Valarie Bachelor Aye
  • Jennifer Brouhard Aye
Action
Bid award
Category
School buildings & construction
Term
Aug 14, 2025 – Nov 12, 2025
This vote
$1,114,913
Schools
ICS-TCN at Cesar Chavez
Funding
Fund 21 Building Fund Measure Y
Resource / site
9657 304
Vendor no.
003557
Presented by
Deputy Chief, Facilities Planning and Management
File
25-1744 · agenda M.-17
Outcome
Adopted, Aug 13, 2025

Official text

Approval by the Board of Education of Agreement Between Owner and Contractor by and between the District and Redgwick Construction Company, Oakland, CA, for the latter to install synthetic turf and perform site preparation, including demolition, grading, and drainage work, in support of the new turf installation at the ICS-TCN Cesar Chavez Turf Replacement Project, in the amount of $1,114,913.00, which includes a contingency of $150,000.00, as the lowest responsible bidder, rejecting all other bids, if any, with the work anticipated to commence on August 14, 2025, and required to be completed within ninety (90) days, with an anticipated ending of November 12, 2025.

History

  1. Adopted

This is an independent project created to provide transparency to the OUSD Community, and is not affiliated with Oakland Unified District. All data used to create the Consent Report Tracker is made public by Legistar, OUSD's official platform for posting legislative records. Plain-English summaries are written by AI with narrow parameters based upon the official text of the reports. Read about how all this works.

Get Updates

Your info is safe with us.