Approves $41,440 paid to Bayview Environmental for storm drain and soil protection at Ralph Bunche
The board is ratifying, meaning approving after the fact, a $41,440.00 contract with Bayview Environmental Services, which includes a $10,000.00 contingency. The company protects storm drains with filters and sandbags and covers bare soil, burned portables and a concrete debris pile with plastic sheeting at the Ralph Bunche Academy demolition project. Work was set to begin September 12, 2025 and last until December 31, 2025.
Plain-English summary written by AI from the official text. AI summary · amounts checked against official text
- Vendor / partner
- Bayview Environmental Services Inc. · Oakland, CA
- Action
- New agreement
- Category Categories and sub-categories are assigned by AI from each item's official text, using a fixed set of definitions. They can be wrong. How categories work
- School buildings & construction
- Term
- Sep 12, 2025 – Dec 31, 2025
- This vote
- $41,440
- Schools
- Ralph Bunche Academy
- Funding
- Fund 21 Building Fund Measure Y
- Resource / site
9658 223- Vendor no.
005216- Presented by
- Deputy Chief, Facilities Planning and Management
- File
25-2268· agendaP.-11- Outcome
- Adopted on the General Consent Report, Sep 24, 2025
Official text
Ratification by the Board of Education of the Construction Agreement Between Owner and Contractor by and between the District and Bayview Environmental Services Inc., Oakland, CA, for the latter to provide construction services protection to Storm Drains which includes: installation of storm drain filers as well as storm drain filter socks on (7) storm drains; includes sandbags as needed Bare Soil Protection Installation of 6-mil poly extending a minimum of 2 ft past base soil where feasible around 10 x 5 section of bare soi; covering burned structures: installing 10 mil poly over (3) burned portables; installing 10 mil poly over existing pile of concrete construction waste; includes sandbags and rope tie downs to secure poly on structure/debris; install 10 mil poly over existing 6 mil poly currently covering structure, as further described in the Proposal, which is attached as Exhibit A to this Agreement, incorporated herein by reference as though fully set forth, as part of the Ralph Bunche Academy Demolition Project, in the amount of $41,440.00, which includes a $10,000.00, contingency fee, with the work anticipated to commence on September 12, 2025, and scheduled to last until December 31, 2025.
History
- Adopted on the General Consent Report