Pays D-Line Constructors up to $59,960 to seal coat Montera Middle School's lower yard
D-Line Constructors would seal coat about 43,672 square feet of the lower yard at Montera Middle School, fix cracks and grind down some metal poles, in one visit. The work prepares the ground for a FIFA-supplied field. The limit of $59,960.00 includes a $5,360.00 contingency, and work runs October 23 to December 23, 2025.
Plain-English summary written by AI from the official text. AI summary · amounts checked against official text
- Vendor / partner
- D-Line Constructors, Inc. · Oakland, CA
- Action
- New agreement
- Category Categories and sub-categories are assigned by AI from each item's official text, using a fixed set of definitions. They can be wrong. How categories work
- School buildings & construction
- Term
- Oct 23, 2025 – Dec 23, 2025
- This vote
- $59,960
- Schools
- Montera Middle School
- Funding
- Fund 1 General Fund ELOP
- Resource / site
2600 211- Vendor no.
001279- Presented by
- Deputy Chief, Facilities Planning and Management
- File
25-2350· agendaO.-3- Outcome
- Adopted on the General Consent Report, Oct 22, 2025
Official text
Approval by the Board of Education of the Construction Agreement Between Owner and Contractor by and between the District and D-Line Constructors, Inc., Oakland, CA, for the latter to provide “construction services to provide seal coating approximately 43,672.45 square feet of the lower yard area, with crack sealing performed as needed. All existing basketball hoops are to remain in place and must be protected during work. In designated areas, metal poles are to be ground down and included in the seal coating to ensure a smooth, uniform surface. All services are to be completed in a single mobilization to support base preparation for the FIFA field, scheduled to be supplied and installed by FIFA, as further described in the Proposal, which is attached as Exhibit A to this Agreement” for the Montera Middle School Site Improvements Project, in the not to exceed amount of $59,960.00, which includes a contingency fee of $5,360.00, with the work scheduled to commence on October 23, 2025, and scheduled to last until December 23, 2025.
History
- Adopted on the General Consent Report