Approves $55,720 with Emergency Rooter to repair the Laurel Elementary sewer line
Emergency Rooter will dig up and repair a sewer line at Laurel Elementary School, add a cleanout, and close off an old storm drain line, with city permits and inspections required. The amount includes a $5,572 contingency fee. Work is expected to start November 13, 2025 and last until December 31, 2025.
Plain-English summary written by AI from the official text. AI summary · amounts checked against official text
- Vendor / partner
- Emergency Rooter · Oakland, CA
- Action
- New agreement
- Category Categories and sub-categories are assigned by AI from each item's official text, using a fixed set of definitions. They can be wrong. How categories work
- School buildings & construction
- Term
- Nov 13, 2025 – Dec 31, 2025
- This vote
- $55,720
- Schools
- Laurel Elementary School
- Funding
- Fund 140 Deferred Maintenance
- Resource / site
9914 131- Vendor no.
001567- Presented by
- Deputy Chief, Facilities Planning and Management
- File
25-2436· agendaO.-5- Outcome
- Adopted on the General Consent Report, Nov 12, 2025
Official text
Approval by the Board of Education of the Construction Agreement Between Owner and Contractor by and between the District and Emergency Rooter, Oakland, CA, for the latter to provide “trench excavation of approximately 130 linear feet, starting from the “Portables” building near Patterson Avenue and continuing toward Kansas Street, passing through landscaped areas and trees. At the building connection (6 feet deep), a two-way cleanout will be installed. The trench will terminate at Kansas Street, where a 2-foot-deep section of concrete sidewalk will be demolished and replaced. The existing storm lateral feeding into Patterson Avenue will be abandoned by excavating in the street, capping the line before it connects to the main, and restoring the asphalt surface. This work will require City of Oakland permits and inspections for the Abandon Sewer Lateral, Street Excavation, and the New Storm Sewer Lateral for the Laurel Elementary School Sewer Lateral Repair Project”, in the amount of $55,720.00, which includes a contingency fee of $5,572.00, with the work anticipated to commence on November 13, 2025, and scheduled to last until December 31, 2025.
History
- Adopted on the General Consent Report