After work began
$50Knot to exceed

Ratifies up to $50,000 for A-Tech Consulting to test school drinking water for lead

A-Tech Consulting will sample drinking fountains, filtered water stations and kitchen sinks at each site, following U.S. Environmental Protection Agency guidelines for reducing lead in drinking water. Samples go to a certified lab and each site gets a report comparing results to action levels. Lab costs are billed per sample. The agreement runs from July 1, 2025 through June 30, 2026. This is a ratification, so the agreement's start date came before the Board vote.

Plain-English summary written by AI from the official text. AI summary · amounts checked against official text

Action
New agreement
Category
School buildings & construction
Term
Jul 1, 2025 – Jun 30, 2026
This vote
$50,000
Funding
Property & Liability
Resource / site
9031-987
Vendor no.
009167
Presented by
Chief Financial Officer
File
25-2732 · agenda O.-14
Outcome
Adopted on the General Consent Report, Dec 10, 2025

Official text

Ratification by the Board of Education of a Services Agreement 2025-2026 by and between the District and A-Tech Consulting, Orange, CA, for the latter, in accordance with U.S. Environmental Protection Agency (EPA) 3Ts Program (Training, Testing, and Taking Action voluntary program) for Reducing Lead in Drinking Water guidelines, as well as District internal standards, provide: 1) Sampling Coverage-Conduct sequential sampling at each site for every: a) Drinking water fountain; b) Filtered water stations; c) Kitchen preparation sink; d) Kitchen three-compartment sink; 2) Sampling & Laboratory Analysis: a) Collect samples following EPA 3Ts protocols for sequential lead testing (e.g., 125-125-250 mL sequence for fountains; 250 mL for filtered water stations); b) Maintain full chain of custody (CoC) for each sample; c) Submit samples to an EPA-certified laboratory for analysis; d) Laboratory analysis costs shall be billed per sample; 3) Logistics & Reporting: a) Clearly label and document all sampled fixtures; b) Process CoC documentation accurately and promptly; c) Provide consolidated, site-specific laboratory reports with results compared against EPA and OUSD action levels;4) Staffing & Timeline: a) Assign sufficient staff and authorize overtime as needed to meet testing and processing demands; b) Expedite analysis to ensure all results are available before the start of the new school year, via Risk Management Department, for the period of July 1, 2025 through June 30, 2026, in an amount not to exceed $50,000.00.

History

  1. Adopted on the General Consent Report

This is an independent project created to provide transparency to the OUSD Community, and is not affiliated with Oakland Unified District. All data used to create the Consent Report Tracker is made public by Legistar, OUSD's official platform for posting legislative records. Plain-English summaries are written by AI with narrow parameters based upon the official text of the reports. Read about how all this works.

Get Updates

Your info is safe with us.