Ratifies up to $3,948.34 for Platinum Packaging to repair a Central Kitchen wrapper machine
The Platinum Packaging Group repaired the Central Kitchen's Ameripak H150 wrapper machine by replacing a failed stepper drive board and damaged wire connectors, then test-ran it with district staff. The agreement covers March 1 to June 30, 2026 and was ratified after work began.
Plain-English summary written by AI from the official text. AI summary · amounts checked against official text
- Vendor / partner
- The Platinum Packaging Group · Paramount, CA
- Action
- New agreement
- Category Categories and sub-categories are assigned by AI from each item's official text, using a fixed set of definitions. They can be wrong. How categories work
- Food, transportation & operations
- Term
- Mar 1, 2026 – Jun 30, 2026
- This vote
- $3,948.34
- Funding
- 5310 - Child Nutrition School Program
- Resource / site
5310-991- Presented by
- Chief Systems and Services Officer
- File
26-0941· agendaO.-20- Outcome
- Adopted on the General Consent Report, May 13, 2026
Official text
Ratification by the Board of Education of a Services Agreement 2025-2026 by and between the District and The Platinum Packaging Group, Paramount, CA, for the latter to provide repair services for the Central Kitchen’s Food Services Ameripak H150 wrapper machine, i.e., remove the failed stepper drive board and all damaged wire connectors and install a new stepper drive board, complete with clips and wire connectors; configure the replacement board with the proper dip switches and jumper settings to ensure correct operational parameters and perform a full test run of the machine using a large meal pack, conducted with the assistance of district staff, to confirm satisfactory results, with all associated technician services required to complete the repair on-site included, via the Nutrition Services Department, for the period of March 1, 2026 through June 30, 2026, in an amount not to exceed $3,948.34.
History
- Adopted on the General Consent Report