$274K

Awards Luna's Grading and Paving $274,000 to replace asphalt at Bret Harte Middle School

Luna's Grading and Paving will replace and resurface asphalt, seal coat and restripe parking areas, and handle disposal of contaminated soil at the driveway at Bret Harte Middle School. The $274,000.00 price includes a $35,000.00 contingency. The company was the lowest responsive bidder, and work is expected to run June 25 to July 31, 2026.

Plain-English summary written by AI from the official text. AI summary · amounts checked against official text

Action
Bid award
Category
School buildings & construction
Term
Jun 25, 2026 – Jul 31, 2026
This vote
$274,000
Schools
Bret Harte Middle School
Funding
Fund 140 Deferred Maintenance
Resource / site
9914 206
Vendor no.
010031
Presented by
Deputy Chief, Facilities Planning and Management
File
26-1332 · agenda R.-29
Outcome
Adopted on the General Consent Report, Jun 24, 2026

Official text

Approval by the Board of Education of Agreement Between Owner and Contractor by and between the District and Luna’s Grading and Paving, San Jose, CA, as the lowest responsive bidder, rejecting all other bids, for the latter to provide construction services which involves asphalt pavement removal and replacement at Bret Harte site, including reconstruction of approximately 12,000 SF of driveway pavement from the street to the loading dock fence, resurfacing of approximately 20,000 SF of existing pavement, and seal coat and restriping of approximately 10,000 SF of parking areas; saw cutting and demolition of existing asphalt and base, subgrade preparation, installation of new aggregate base and hot mix asphalt, utility adjustments, implementation of dust control measures, traffic control, and protection and repair of adjacent improvements including City sidewalk as required proper transportation and disposal of contaminated soil at the driveway, and coordination with applicable regulatory agencies for required approvals and documentation to ensure compliance with environmental regulations, for the Bret Harte Middle School Asphalt Replacement Project, in the amount of $274,000.00, which includes a contingency allowance of $35,000.00, with the work anticipated to commence on June 25, 2026, and required to be completed within thirty-six days (36), with an anticipated ending of July 31, 2026.

History

  1. Adopted on the General Consent Report

This is an independent project created to provide transparency to the OUSD Community, and is not affiliated with Oakland Unified District. All data used to create the Consent Report Tracker is made public by Legistar, OUSD's official platform for posting legislative records. Plain-English summaries are written by AI with narrow parameters based upon the official text of the reports. Read about how all this works.

Get Updates

Your info is safe with us.