Awards $816,100.00 to Redgwick Construction for playground and garden upgrades at Sequoia Elementary
Redgwick Construction Company of Oakland was the lowest responsible bidder for site work at Sequoia Elementary School: removing old play structures and asphalt, creating nature and garden spaces with irrigation and drainage, preparing for new play structures, planting trees, and sealing pavement and murals. The amount is $816,100.00, including an $82,400.00 contingency, with work expected from August 27 to October 30, 2026. The Board is also rejecting all other bids.
Plain-English summary written by AI from the official text. AI summary · amounts checked against official text
- Vendor / partner
- Redgwick Construction Company · Oakland, CA
- Action
- Bid award
- Category Categories and sub-categories are assigned by AI from each item's official text, using a fixed set of definitions. They can be wrong. How categories work
- School buildings & construction
- Term
- Aug 27, 2026 – Oct 30, 2026
- This vote
- $816,100
- Schools
- Sequoia Elementary School
- Funding
- Building 21 Measure Y
- Resource / site
9657-151- Vendor no.
003557- Presented by
- Deputy Chief, Facilities Planning and Management
- File
26-1666· agendaR.-8- Outcome
- Adopted on the General Consent Report, Aug 26, 2026
Official text
Approval by the Board of Education of a Bid Award, rejecting all other bids, and of an Agreement Between Owner and Contractor by and between the District and Redgwick Construction Company, Oakland, CA, for the latter to provide all necessary site preparation activities, including but not limited to removal of existing play structures, basketball hoops, planers, and selected asphalt areas; create new nature and garden spaces through soil excavation and the installation of irrigation and drainage systems; preparation for new play structures, including perimeter curbing and playground surfacing; additional site enhancements consisting of new tree planting with supporting irrigation systems, seal coating of existing pavement, and seal coating over new murals; more specifically described in specifications for the Sequoia Elementary School Site Improvements Project, in the amount of $816,100.00, which includes a contingency of $82,400.00, as the lowest responsible, responsive bidder, with the work anticipated to commence on August 27, 2026, and required to be completed within sixty (60) days, with an anticipated ending of October 30, 2026.
History
- Adopted on the General Consent Report