$816K

Awards $816,100.00 to Redgwick Construction for playground and garden upgrades at Sequoia Elementary

Redgwick Construction Company of Oakland was the lowest responsible bidder for site work at Sequoia Elementary School: removing old play structures and asphalt, creating nature and garden spaces with irrigation and drainage, preparing for new play structures, planting trees, and sealing pavement and murals. The amount is $816,100.00, including an $82,400.00 contingency, with work expected from August 27 to October 30, 2026. The Board is also rejecting all other bids.

Plain-English summary written by AI from the official text. AI summary · amounts checked against official text

Action
Bid award
Category
School buildings & construction
Term
Aug 27, 2026 – Oct 30, 2026
This vote
$816,100
Schools
Sequoia Elementary School
Funding
Building 21 Measure Y
Resource / site
9657-151
Vendor no.
003557
Presented by
Deputy Chief, Facilities Planning and Management
File
26-1666 · agenda R.-8
Outcome
Adopted on the General Consent Report, Aug 26, 2026

Official text

Approval by the Board of Education of a Bid Award, rejecting all other bids, and of an Agreement Between Owner and Contractor by and between the District and Redgwick Construction Company, Oakland, CA, for the latter to provide all necessary site preparation activities, including but not limited to removal of existing play structures, basketball hoops, planers, and selected asphalt areas; create new nature and garden spaces through soil excavation and the installation of irrigation and drainage systems; preparation for new play structures, including perimeter curbing and playground surfacing; additional site enhancements consisting of new tree planting with supporting irrigation systems, seal coating of existing pavement, and seal coating over new murals; more specifically described in specifications for the Sequoia Elementary School Site Improvements Project, in the amount of $816,100.00, which includes a contingency of $82,400.00, as the lowest responsible, responsive bidder, with the work anticipated to commence on August 27, 2026, and required to be completed within sixty (60) days, with an anticipated ending of October 30, 2026.

History

  1. Adopted on the General Consent Report

This is an independent project created to provide transparency to the OUSD Community, and is not affiliated with Oakland Unified District. All data used to create the Consent Report Tracker is made public by Legistar, OUSD's official platform for posting legislative records. Plain-English summaries are written by AI with narrow parameters based upon the official text of the reports. Read about how all this works.

Get Updates

Your info is safe with us.