Text discrepancy
$161K

Awards $160,611 contract to A and B Mechanical to replace the boiler at Sequoia Elementary

A and B Mechanical, Inc. of Livermore will remove the old steam boiler at Sequoia Elementary School and install a new one. The work includes demolition, hazardous-materials cleanup as needed, reconnecting steam, gas and electrical lines, and testing the new equipment. The company was the lowest qualified bidder, and the $160,611 includes a $13,500 contingency, with work expected to run from October 15 to November 15, 2026.

Plain-English summary written by AI from the official text. AI summary · amounts checked against official text

Discrepancy from the official text. The text requires completion within sixty days of an October 15, 2026 start, but states an anticipated end date of November 15, 2026, which is about thirty days after the start. (Confirmed by a second, independent AI reading.)
Action
Bid award
Category
School buildings & construction
Term
Oct 15, 2026 – Nov 15, 2026
This vote
$160,611
Schools
Sequoia Elementary School
Funding
140 Deferred Maintenance
Resource / site
9914/151
Vendor no.
010117
Presented by
Deputy Chief, Facilities Planning and Management
File
26-1924 · agenda R.-1
Outcome
Adopted on the General Consent Report, Oct 14, 2026

Official text

Approval by the Board of Education of a Bid Award, rejecting all other bids, and an Agreement Between Owner and Contractor by and between the District and A and B Mechanical, Inc., Livermore, CA, for the latter to remove existing steam boiler and install new cast iron sectional steam boiler, with work including demolition of the existing boiler and associated piping, hazmat abatement as needed, rigging and installation of the new boiler, reconnection to existing steam, gas, and electrical services, adaptation of the existing flue system, and full commissioning to confirm proper operation of the new equipment for the Sequoia Elementary School Boiler Replacement Project, in the amount of $160,611.00, as the lowest responsive, responsible bidder, which includes a contingency of $13,500.00 with the work anticipated to commence on October 15, 2026, and required to be completed within sixty (60) days, with an anticipated ending of November 15, 2026.

History

  1. Adopted on the General Consent Report

This is an independent project created to provide transparency to the OUSD Community, and is not affiliated with Oakland Unified District. All data used to create the Consent Report Tracker is made public by Legistar, OUSD's official platform for posting legislative records. Plain-English summaries are written by AI with narrow parameters based upon the official text of the reports. Read about how all this works.