The KDI Group, Inc.
About this vendor
A construction services company based in Oakland, California. It is incorporated in California as a general corporation and was formed in 2007.
- Registered name
- The Kdi Group, Inc.
- Type
- Company
- Headquarters
- Oakland, CA
- CA entity no.
3049989
Researched by AI from public sources on Oct 1, 2026, checked by a second, independent AI review, with every contact detail matched to a cited page. Not from OUSD or Legistar; may be incomplete or out of date. Sources: The Kdi Group, Inc. Oakland, CA - filing information, The KDI Group Inc.
What the district contracts them for
Categories and action types are this tool's classification (AI-assigned, then checked), not Legistar fields. How this works.
Official information from Legistar
Legistar has no vendor profile; a vendor appears only as the vendor number on each record. These fields come from the official records listed at the bottom of this page.
- OUSD vendor number
002377- Named in the agenda text as
- The KDI Group, Inc.; KDI Group, Inc.; KDI Consultants, Inc.; The KDI Group Inc.; Atlas Technical Consultants, LLC; KDI Consultants
- Presenting offices
- Deputy Chief, Facilities Planning and Management (40); Chief Academic Officer (1)
- Record types
- Agreement or Contract (41)
- Funding sources
- 01 General Fund; 14 Deferred Maintenance; 21 Building Fund; 25 Capital Facilities; 35 County Schools Facilities; 40 Special Reserve for Capital Outlay Projects; Bond 35 County School Facilities; Building Fund 21 Measure J; Building Fund 21 Measure Y; Building Fund 21/Measure Y; Building Fund 21Measure Y; Building fund 21 Measure Y; Deferred Fund 140; Fd 21/ Measure Y; Fund 14 – Deferred Maintenance; Fund 21 Building Fund Measure J; Fund 21 Building Fund Measure Y; Fund 21 Building Funds Measure Y; Fund 21 Building Funds, Measure Y; Fund 21 Measure B; Fund 21 Measure J; Fund 21, Building Fund Measure Y Bond; Fund 21, Building Funds Measure Y; Fund 21, Building Funds Measure Y Bond; Fund 21, Measure J; Fund 21/Measure Y; Fund 35 COunty Schools Facilities; Fund 35 County School Facilities; Fund 40- Special Reserve for Capital Facilities
- Resource / site codes
302-96507710 2367710/2369399 94939450 -2159450 3029650 2159650 3029650-2019650-2159650/3029655 1779655 2019655 2049655 2129655 2369655 9189655 9919655-182, 991, 170, 2199655-182, 991,170, 2199655/ 2019655/1809655/2019655/2049655/2359655/2369657/2049657/9189799 2159799 95609799-2159914/1069914/2169940/150
Approved on the consent report (35)
- Adds $230,624 for The KDI Group's inspection services at Fremont High modernizationApr 22, 2026 ·
P.-3·26-0694· Adopted on the General Consent ReportRaises existing contractLarge increase+$231Knew total $461K - Sets up The KDI Group, Inc. as a $0 master contract for school project inspectorsJan 28, 2026 ·
O.-4·25-3055· Jan 29, 2026 · Adopted on the General Consent ReportNo cost stated - Adds $115,389 to KDI Group's Fremont High modernization inspection contract and extends it a yearDec 10, 2025 ·
P.-3·25-2592· Apr 10, 2025 – Dec 31, 2026 · Adopted on the General Consent ReportRaises existing contractLarge increaseMulti-year+$115Knew total $230K - Hires KDI Group for up to $407,418 as inspector of record on the new Melrose Leadership Academy buildingDec 10, 2025 ·
P.-20·25-2701· Dec 11, 2025 – Aug 30, 2028 · Adopted on the General Consent ReportMulti-year$407Knot to exceed - Hires KDI Group for up to $27,830 as inspector of record for West Oakland Middle window replacementDec 10, 2025 ·
P.-21·25-2705· Dec 11, 2025 – Jun 30, 2026 · Adopted on the General Consent Report$28Knot to exceed - Approves $9,350 for KDI Group to inspect construction at Claremont Middle SchoolSep 10, 2025 ·
P.-1·25-1738· Sep 11, 2025 – Sep 30, 2025 · Adopted on the General Consent Report$9K - Adds $20,810 for KDI Group's inspection work on the Urban Promise Academy portable moveJun 25, 2025 ·
L.-5·25-1405· Adopted on the General Consent ReportRaises existing contract+$21Knew total $76K - Pays KDI Group $4,060 to inspect the Westlake Middle School roof replacementMay 28, 2025 ·
L.-2·25-0980· May 29, 2025 – Aug 5, 2025 · Adopted on the General Consent Report$4K - Pays KDI Group $5,220 to inspect the Chabot Elementary library and main building roof workMay 28, 2025 ·
L.-3·25-0989· May 15, 2025 – Aug 5, 2025 · Adopted on the General Consent ReportAfter work began$5K - Adds $38,990 for extra inspection work on the Urban Promise Academy portable moveApr 23, 2025 ·
L.-1·25-0670· Adopted on the General Consent ReportRaises existing contractLarge increase+$39Knew total $55K - Hires KDI Group for up to $114,620 of construction inspection at Fremont High modernizationApr 9, 2025 ·
M.-1·25-0592· Apr 10, 2025 – Dec 31, 2025 · Adopted on the General Consent Report$115Knot to exceed - Adds $45,180 to KDI Group's inspections for the West Oakland Middle School window projectJan 22, 2025 ·
M.-3·24-3099· Adopted on the General Consent ReportRaises existing contract+$45Knew total $168K - Adds $26,730 for The KDI Group's roof inspection closeout at Urban PromiseJan 22, 2025 ·
M.-7·24-3146· Adopted on the General Consent ReportRaises existing contractLarge increase+$27Knew total $32K - Pays The KDI Group up to $48,906 to inspect construction of a therapy unit at the Santa Fe siteNov 13, 2024 ·
L.-5·24-2527· Nov 14, 2024 – Jun 30, 2025 · Adopted on the General Consent Report$49Knot to exceed - Adds $16,200 and six months for KDI Group's construction inspection at Claremont Middle's multi-purpose roomAug 14, 2024 ·
U.-5·24-1730· Dec 2, 2021 – Dec 30, 2024 · Adopted on the General Consent ReportAfter work beganRaises existing contractMulti-year+$16Knew total $529K - Adds $42,000 and more time for KDI Group's inspection work on school solar projectsJun 26, 2024 ·
U.-5·24-1463· Feb 9, 2023 – Jul 31, 2024 · Adopted on the General Consent ReportAfter work beganRaises existing contractMulti-year+$42Knew total $194K - Hires KDI Group for up to $5,500 to inspect the Urban Promise re-roofing projectJun 5, 2024 ·
U.-2·24-1157· Jun 6, 2024 – Aug 31, 2024 · Adopted on the General Consent Report$6Knot to exceed - Pays KDI Group up to $122,815 to inspect West Oakland Middle School window replacementMay 8, 2024 ·
U.-2·24-0921· May 9, 2024 – Jul 31, 2025 · Adopted on the General Consent ReportMulti-year$123Knot to exceed - Adds $25,080 and extends KDI Group's inspection work on the Claremont multi-purpose room to June 2024Jan 24, 2024 ·
U.-1·23-2749· Dec 2, 2021 – Jun 30, 2024 · Adopted on the General Consent ReportAfter work beganRaises existing contractMulti-year+$25Knew total $513K - Adds $56,000 to KDI Group's inspection contract for the solar projects at three school sitesNov 16, 2023 ·
E.-18·23-2448· Adopted on the General Consent ReportRaises existing contractLarge increase+$56Knew total $152K - Pays KDI Group up to $19,800.00 to inspect the Oakland High battery backup installationNov 16, 2023 ·
E.-20·23-2453· Nov 30, 2023 – Dec 31, 2024 · Adopted on the General Consent Report$20Knot to exceed - Approves up to $54,324 for KDI Group to inspect solar construction at four school sitesOct 11, 2023 ·
U.-2·23-1970· Oct 12, 2023 – Dec 30, 2024 · Adopted on the General Consent ReportMulti-year$54Knot to exceed - Adds $69,000 and two months to KDI Group's inspection work at Claremont Middle SchoolSep 13, 2023 ·
U.-7·23-1768· Dec 2, 2021 – Dec 31, 2023 · Adopted on the General Consent ReportRaises existing contractMulti-year+$69Knew total $488K - Hires KDI Group for up to $29,150 to inspect Roosevelt Middle School modernization workMay 24, 2023 ·
U.-3·23-0985· May 25, 2023 – Dec 31, 2023 · Adopted on the General Consent Report$29Knot to exceed - Adds $32,032 for Atlas Technical Consultants to inspect solar work at 4 more school sitesApr 12, 2023 ·
U.-2·23-0502· Feb 9, 2023 – Oct 31, 2023 · Adopted on the General Consent ReportRaises existing contractLarge increase+$32Knew total $56K - Adds $48,754 for KDI Group to inspect solar work at 4 more school sitesApr 12, 2023 ·
U.-3·23-0505· Feb 9, 2023 – Oct 31, 2023 · Adopted on the General Consent ReportRaises existing contractLarge increaseText discrepancy+$49Knew total $96K - Pays KDI Group up to $46,800 for inspector-of-record services on three schools' solar projectsFeb 8, 2023 ·
U.-3·23-0064· Feb 9, 2023 – Aug 31, 2023 · Adopted on the General Consent Report$47Knot to exceed - Pays KDI Group up to $6,000 for inspection close-out at Madison Middle School expansionApr 27, 2022 ·
V1.-1·22-0787· Apr 28, 2022 – Dec 31, 2022 · Adopted on the General Consent Report$6Knot to exceed - Pays KDI Group $418,550 to inspect construction at the Claremont Middle multipurpose roomDec 1, 2021 ·
V1.-3·21-2683· Dec 2, 2021 – Oct 31, 2023 · Adopted on the General Consent ReportMulti-year$419K - Adds $78,430 for KDI Group's state-required inspections at the new Fremont High SchoolSep 8, 2021 ·
V1.-13·21-1849· Adopted on the General Consent ReportRaises existing contract+$78Knew total $1.45M - Adds $18,700 and a year for KDI Consultants' inspection work at Madison Park AcademyApr 14, 2021 ·
V1.-5·21-0666· Feb 24, 2016 – Dec 31, 2021 · Adopted on the General Consent ReportAfter work beganRaises existing contractMulti-year+$19Knew total $875K - Extends KDI Consultants' Fremont High School code compliance monitoring by one yearFeb 24, 2021 ·
V1.-6·21-0217· Feb 28, 2018 – Feb 28, 2022 · Adopted on the General Consent ReportMulti-yearTime extension onlyNo cost stated - Adds $61,520 for KDI Consultants' extra inspections on the Madison Park Academy expansionAug 26, 2020 ·
P1.-4·20-1452· Adopted on the General Consent ReportRaises existing contract+$62Knew total $856K - Adds $368,500 for more monitoring work by KDI Consultants on the Fremont High School rebuildJun 24, 2020 ·
P1.-5·20-1127· Feb 20, 2018 – Feb 28, 2021 · Adopted on the General Consent ReportRaises existing contractMulti-year+$369Knew total $1.37M - Adds $140,280 for extra state-required inspections at Madison Park Academy and extends KDI to 2020Dec 11, 2019 ·
P.-23·19-2390· Feb 24, 2016 – Dec 31, 2020 · Adopted on the General Consent ReportRaises existing contractMulti-year+$140Knew total $795K
Other consent appearances (1)
Earlier appearances of items decided at a later meeting, and items not adopted or not yet acted on. These aren't counted in the totals above.
- Pays The KDI Group up to $15,906 for construction inspections on the Urban Promise Academy portable moveApr 24, 2024 ·
T.-1· Not yet acted on$16Knot to exceed
All Legistar records (41)
Every Legistar record carrying this vendor number in any year, on consent or not, plus records Legistar links to this vendor's consent items (for example, an amendment's original agreement). Newest first.
| Date | File | Official title | Type | Status |
|---|---|---|---|---|
| Apr 22, 2026 | 26-0694 | Amendment No. 2, Agreement for Inspector of Record Services for Construction – The KDI Group, Inc. – Fremont High School Modernization Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 26-0680 · Related: 25-0592, 25-2592 · Plain-English summary | Agreement or Contract | Passed |
| Jan 28, 2026 | 25-3055 | Master Project Inspector of Record Services Agreement - The KDI Group, Inc. - DSA Certified Project Inspectors at Various School Sites Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 26-0116 · Plain-English summary | Agreement or Contract | Passed |
| Dec 10, 2025 | 25-2705 | Agreement for Inspector of Record Services for Construction - The KDI Group Inc - West Oakland Middle School Window Replacement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-2119 · Plain-English summary | Agreement or Contract | Passed |
| Dec 10, 2025 | 25-2701 | Agreement for Inspector of Record Services for Construction– The KDI Group Inc. – Melrose Leadership Academy at Maxwell Park, New Middle School Building and Modernization Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-2118 · Plain-English summary | Agreement or Contract | Passed |
| Dec 10, 2025 | 25-2592 | Amendment No. 1, Agreement for Inspection of Record Services for Construction – The KDI Group, Inc. – Fremont High School Modernization Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-2101 · Related: 25-0592, 26-0694 · Plain-English summary | Agreement or Contract | Passed |
| Sep 10, 2025 | 25-1738 | Agreement for Inspector of Record Services for Construction – KDI Group, Inc. – Claremont Middle School Multi-Purpose Room & Kitchen Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-1549 · Plain-English summary | Agreement or Contract | Passed |
| Jun 25, 2025 | 25-1405 | Amendment No. 2, Agreement for Inspector of Record Services for Construction – The KDI Group, Inc. - Urban Promise Academy Portable Relocation Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-1059 · Related: 24-0680, 25-0670 · Plain-English summary | Agreement or Contract | Passed |
| May 28, 2025 | 25-0989 | Agreement for Inspector of Record Services for Construction - The KDI Group Inc. - Chabot Elementary School Library and Main Building Roof Replacement Project - Buildings and Grounds DepartmentDeputy Chief, Facilities Planning and Management · Enactment no. 25-0786 · Plain-English summary | Agreement or Contract | Passed |
| May 28, 2025 | 25-0980 | Agreement for Inspector of Record Services for Construction– The KDI Group Inc. – Westlake Middle School Roof Replacement Project - Buildings and Grounds DepartmentDeputy Chief, Facilities Planning and Management · Enactment no. 25-0785 · Plain-English summary | Agreement or Contract | Passed |
| Apr 23, 2025 | 25-0670 | Amendment No. 1, Agreement for Inspector of Record Services for Construction – The KDI Group, Inc. - Urban Promise Academy Portable Relocation Project– Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-0545 · Related: 24-0680, 25-1405 · Plain-English summary | Agreement or Contract | Passed |
| Apr 9, 2025 | 25-0592 | Agreement for Inspection of Record Services for Construction – The KDI Group, Inc. – Fremont High School Modernization Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-0504 · Related: 25-2592, 26-0694 · Plain-English summary | Agreement or Contract | Passed |
| Jan 22, 2025 | 24-3146 | Amendment No. 1, Agreement for Inspection of Record Services for Construction – The KDI Group, Inc. - Urban Promise Roofing Replacement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-2473 · Related: 24-1157 · Plain-English summary | Agreement or Contract | Passed |
| Jan 22, 2025 | 24-3099 | Amendment No. 1, Agreement for Inspection of Record Services for Construction – The KDI Group, Inc. – West Oakland Middle School Window Replacement Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-2469 · Related: 24-0921 · Plain-English summary | Agreement or Contract | Passed |
| Nov 13, 2024 | 24-2527 | Agreement for Inspection of Record Services for Construction – The KDI Group, Inc. – California Children Services Medical Therapy Unit at Santa Fe Site Portable Modernization Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-2034 · Plain-English summary | Agreement or Contract | Passed |
| Aug 14, 2024 | 24-1730 | Amendment No. 3, Agreement for Inspector of Record Services for Construction - The KDI Group, Inc. - Claremont Middle School Multi-Purpose Room Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-1496 · Related: 21-2683, 23-1768, 23-2749 · Plain-English summary | Agreement or Contract | Passed |
| Jun 26, 2024 | 24-1463 | Amendment No. 3, Agreement for Inspection of Record Services for Construction –KDI Group, Inc. - Solar Initiative Various Sites – Acorn Woodland Elementary School/Lockwood STEAM Academy & New Highland Academy Project - Group 2 Schools - Division of FPMDeputy Chief, Facilities Planning and Management · Enactment no. 24-1344 · Related: 23-0064, 23-0505, 23-2448 · Plain-English summary | Agreement or Contract | Passed |
| Jun 5, 2024 | 24-1157 | Agreement for Inspector of Record Services for Construction – The KDI Group, Inc. – Urban Promise Re-roofing Project– Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-1196 · Related: 24-3146 · Plain-English summary | Agreement or Contract | Passed |
| May 8, 2024 | 24-0921 | Agreement for Inspector of Record Services for Construction - The KDI Group, Inc. - West Oakland Middle School Window Replacement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-0848 · Related: 24-3099 · Plain-English summary | Agreement or Contract | Passed |
| Apr 24, 2024 | 24-0680 | Agreement for Inspector of Record Services for Construction - The KDI Group, Inc. - Urban Promise Academy Portable Relocation Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-0705 · Related: 25-0670, 25-1405 · Plain-English summary | Agreement or Contract | Passed |
| Jan 24, 2024 | 23-2749 | Amendment No. 2, Agreement for Inspector of Record Services for Construction – KDI Group, Inc. – Claremont Middle School Multi-Purpose Room Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-0245 · Related: 21-2683, 23-1768, 24-1730 · Plain-English summary | Agreement or Contract | Passed |
| Nov 16, 2023 | 23-2453 | Agreement for Inspection of Record Services for Construction – KDI Group, Inc. – Oakland High School Battery Backup Plant Installation Project– Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1949 · Plain-English summary | Agreement or Contract | Passed |
| Nov 16, 2023 | 23-2448 | Amendment No. 2, Agreement for Inspection of Record Services for Construction –KDI Group, Inc. - Solar Initiative Various Sites – Acorn Woodland Elementary School/Lockwood STEAM Academy & New Highland Academy Project - Group 2 Schools - Division of FaciliDeputy Chief, Facilities Planning and Management · Enactment no. 23-1947 · Related: 23-0064, 23-0505, 24-1463 · Plain-English summary | Agreement or Contract | Passed |
| Oct 11, 2023 | 23-1970 | Agreement for Inspection of Record Services for Construction - KDI Group, Inc. - Solar Initiative Project -Various Sites: Horace Mann; Madison Park; Oakland Academy of Knowledge and Esperanza - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1776 · Plain-English summary | Agreement or Contract | Passed |
| Sep 13, 2023 | 23-1768 | Amendment No. 1, Agreement for Inspector of Record Services for Construction – KDI Group, Inc. – Claremont Middle School Multi-Purpose Room Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1612 · Related: 23-2749, 24-1730 · Plain-English summary | Agreement or Contract | Passed |
| May 24, 2023 | 23-0985 | Agreement for Inspector of Record Services for Construction – KDI Group, Inc. – Roosevelt Middle School Modernization Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1052 · Plain-English summary | Agreement or Contract | Passed |
| Apr 12, 2023 | 23-0505 | Amendment No. 1, Agreement for Inspection of Record Services for Construction –KDI Group, Inc. - Solar Initiative Various Sites – Acorn Woodland Elementary School/Lockwood STEAM Academy & New Highland Academy Project - Division of Facilities Planning andDeputy Chief, Facilities Planning and Management · Enactment no. 23-0660 · Related: 23-0064, 23-2448, 24-1463 · Plain-English summary | Agreement or Contract | Passed |
| Apr 12, 2023 | 23-0502 | Amendment No. 1, Agreement for Engineering Services – Atlas Technical Consultants, LLC - Solar Initiative Various Sites – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-0659 · Related: 23-0062 · Plain-English summary | Agreement or Contract | Passed |
| Feb 8, 2023 | 23-0064 | Agreement for Inspection of Record Services for Construction - KDI Group, Inc.- Solar Initiative - Acorn Woodland Elementary School/Lockwood STEAM Academy & New Highland Academy Project - Division of FP&MDeputy Chief, Facilities Planning and Management · Enactment no. 23-0260 · Related: 23-0505, 23-2448, 24-1463 · Plain-English summary | Agreement or Contract | Passed |
| Feb 8, 2023 | 23-0062 | Agreement for Engineering Services – Atlas Technical Consultants, LLC - Solar Initiative Various Sites – Acorn Woodland Elementary School/Lockwood STEAM Academy & New Highland Academy Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-0258 · Related: 23-0502 | Agreement or Contract | Passed |
| Apr 27, 2022 | 22-0787 | Agreement for Inspector of Record Services for Construction - KDI Group, Inc. - Madison Middle School New Expansion Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 22-0734 · Plain-English summary | Agreement or Contract | Passed |
| Dec 1, 2021 | 21-2683 | Agreement for Inspector of Record Services for Construction – KDI Group, Inc. – Claremont Middle School Multi-purpose Room Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 21-1961 · Related: 23-2749, 24-1730 · Plain-English summary | Agreement or Contract | Passed |
| Sep 8, 2021 | 21-1849 | Amendment No. 3, Independent Consultant Agreement - KDI Group, Inc.- Fremont New Construction Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 21-1452 · Plain-English summary | Agreement or Contract | Passed |
| Apr 14, 2021 | 21-0666 | Amendment No. 5, Independent Consultant Agreement - KDI Consultants, Inc. – Madison Park Academy Expansion Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 21-0586 · Plain-English summary | Agreement or Contract | Passed |
| Feb 24, 2021 | 21-0217 | Amendment No. 2, Independent Consultant Agreement – KDI Consultants, Inc.– Fremont High School New Construction Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 21-0273 · Plain-English summary | Agreement or Contract | Passed |
| Aug 26, 2020 | 20-1452 | Amendment No. 4, Independent Consultant Agreement for Professional Services - KDI Consultants, Inc. – Madison Park Academy Expansion Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 20-1312 · Plain-English summary | Agreement or Contract | Passed |
| Jun 24, 2020 | 20-1127 | Amendment No. 1, Independent Consultant Agreement for Professional Services –KDI Consultants, Inc.– Fremont New Construction Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 20-1055 · Plain-English summary | Agreement or Contract | Passed |
| Dec 11, 2019 | 19-2390 | Amendment No. 3, Independent Consultant Agreement for Professional Services - KDI Consultants, Inc. - Madison Park Academy New Construction Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 19-1784 · Plain-English summary | Agreement or Contract | Passed |
| Jun 26, 2019 | 19-1461 | Independent Consultant Agreement for Professional Services Less Than $92,600 – KDI Consultants, Inc. – Joaquin Miller Elementary School Fire Alarm Replacement ProjectDeputy Chief, Facilities Planning and Management · Enactment no. 19-1047 | Agreement or Contract | Passed |
| Jun 26, 2019 | 19-0969 | Independent Consultant Agreement for Professional Services Less Than $92,000 – KDI Consultants, Inc. – Joaquin Miller Fire Alarm Replacement ProjectDeputy Chief, Facilities Planning and Management · Enactment no. 19-1025 | Agreement or Contract | Passed |
| May 22, 2019 | 19-0906 | Amendment No. 2, Independent Consultant Agreement for Professional Services Greater Than $90,200 – KDI Consultants, Inc. – Madison Middle School New Expansion ProjectDeputy Chief, Facilities Planning and Management · Enactment no. 19-0764 | Agreement or Contract | Passed |
| Oct 24, 2018 | 18-1990 | Amendment No. 1, Independent Consultant Agreement for Professional Services – KDI Consultants, Inc. – Madison Park Academy Expansion ProjectChief Academic Officer · Enactment no. 18-1622 | Agreement or Contract | Passed |