DecoTech Systems, Inc.
About this vendor
DecoTech Systems is a California corporation based in Walnut Creek that provides audio/visual and information technology systems. It works as an integrator and licensed contractor for network, security and electrical infrastructure. Its website says it serves education, state and local government, and commercial clients.
- Type
- Company
- Website
- decotech.com
- Phone
- 925-954-1520
- sales@decotech.com
- Address
- 1180 Mt Diablo Blvd. Suite 300 Walnut Creek, CA 94596
Researched by AI from public sources on Oct 1, 2026, checked by a second, independent AI review, with every contact detail matched to a cited page. Not from OUSD or Legistar; may be incomplete or out of date. Sources: Contact - DecoTech Systems, DecoTech Systems.
What the district contracts them for
Categories and action types are this tool's classification (AI-assigned, then checked), not Legistar fields. How this works.
Official information from Legistar
Legistar has no vendor profile; a vendor appears only as the vendor number on each record. These fields come from the official records listed at the bottom of this page.
- OUSD vendor number
001325- Named in the agenda text as
- DecoTech Systems, Inc.; DecoTech Systems; Deco Tech Systems, Inc.; Deco Tech Systems
- Presenting offices
- Deputy Chief, Facilities Planning and Management (54); Chief Academic Officer (2)
- Record types
- Agreement or Contract (54); Motion (2)
- Funding sources
- Building 21 Measure Y; Building Fund 1 Measure Y; Building Fund 21 Measure B; Building Fund 21 Measure Y; Building Fund 21 Measure Y & ELOP; Building Fund 31 Measure Y; Building fund 21 Measure Y; Fund 1 General Services ESSER III; Fund 21 Building Fund; Fund 21 Building Fund Measure B; Fund 21 Building Fund Measure J; Fund 21 Building Fund Measure Y; Fund 21 Building Fund, Measure B; Fund 21 Building Fund, Measure Y; Fund 21 Building Funds Measure B; Fund 21 Building Funds Measure J; Fund 21 Building Funds Measure Y; Fund 21 Building Funds, Measure B; Fund 21 Building Funds, Measure Y; Fund 21 Measure B; Fund 21 Measure J; Fund 21 Measure Y; Fund 21, Building Funds Measure B; Fund 21, Measure B; Fund 21/Measure B; General Fund; Oakland Fund Children and Youth
- Resource / site codes
0000/9863213 2199121-9229199 9189650 1039650 1319650 2109650 3339650 9189650 9559650/9009655 1319655 1549655 2049655 2129655 3019655 3049655 9189655-3019655-3049655-3069655-3539657 1169657 1509657 2069657 2299657 9189657/1389657/2119657/2159657/22369657/3109657/9189750/00009799 1219799 2159799 9189799-3039799-9121 & 3109799/1609799/90009799/9922
Approved on the consent report (54)
- Awards $101,854 to Deco Tech Systems for new security cameras at Lincoln ElementarySep 9, 2026 ·
R.-1·26-1677· Aug 27, 2026 – Nov 25, 2026 · Adopted on the General Consent ReportAfter work began$102K - Adds $43,077 to keep Deco Tech's security camera and door entry maintenance runningSep 9, 2026 ·
R.-4·26-1713· Adopted on the General Consent ReportRaises existing contract+$43Knew total $564K - Approves $6,554.38 for Deco Tech Systems to upgrade door entry at Dewey AcademyMay 13, 2026 ·
P.-2·26-0829· Mar 20, 2026 – Mar 27, 2026 · Adopted on the General Consent ReportAfter work began$7K - Ratifies $7,897.94 for Deco Tech Systems' new door entry system at Garfield ElementaryApr 22, 2026 ·
P.-5·26-0720· Feb 17, 2026 – Mar 17, 2026 · Adopted on the General Consent ReportAfter work began$8K - Adds $47,350 and 91 days to DecoTech's security camera maintenance contractMar 25, 2026 ·
P.-2·26-0445· Aug 15, 2024 – Nov 14, 2026 · Adopted on the General Consent ReportRaises existing contractMulti-year+$47Knew total $521K - Awards Deco Tech Systems $181,300 to install security cameras at Acorn Woodland and another schoolFeb 25, 2026 ·
P.-2·26-0120· Feb 26, 2026 – Jun 26, 2026 · Adopted on the General Consent ReportText discrepancy$181K - Awards DecoTech a $101,100 contract for new security cameras at Santa Fe ElementaryJan 14, 2026 ·
P.-5·25-2902· Jan 15, 2026 – Apr 15, 2026 · Adopted on the General Consent Report$101K - Extends DecoTech's door entry upgrade contract 119 days to December 31, 2025Dec 10, 2025 ·
P.-15·25-2691· Jun 5, 2025 – Dec 31, 2025 · Adopted on the General Consent ReportAfter work beganTime extension onlyNo cost stated - Extends the Laurel Child Development Center security project contract to December 31, 2025Nov 12, 2025 ·
P.-1·25-2406· Jul 14, 2025 – Dec 31, 2025 · Adopted on the General Consent ReportAfter work beganTime extension onlyNo cost stated - Pays DecoTech Systems up to $44,925.51 to install fiber optic network cabling at two schoolsOct 22, 2025 ·
P.-2·25-2338· Oct 23, 2025 – Dec 30, 2025 · Adopted on the General Consent Report$45Knot to exceed - Buys $3,123.36 of Ethernet cable from DecoTech Systems for the CalShape Ventilation ProjectAug 27, 2025 ·
M.-6·25-1891· Aug 29, 2025 · Adopted on the General Consent Report$3K - Ratifies up to $19,089.19 for DecoTech Systems to add cameras at La Escuelita ElementaryAug 27, 2025 ·
M.-8·25-1961· Aug 11, 2025 – Sep 30, 2025 · Adopted on the General Consent ReportAfter work began$19Knot to exceed - Pays DecoTech up to $83,900 to install security cameras at Franklin ElementaryAug 13, 2025 ·
M.-2·25-1679· Aug 14, 2025 – Nov 12, 2025 · Adopted on the General Consent Report$84Knot to exceed - Awards DecoTech $96,655 to install security cameras at Brookfield ElementaryAug 13, 2025 ·
M.-9·25-1719· Aug 14, 2025 – Nov 12, 2025 · Adopted on the General Consent Report$97K - Ratifies $11,805 for DecoTech to install two security cameras at Laurel Child Development CenterAug 13, 2025 ·
M.-10·25-1720· Jul 14, 2025 – Aug 14, 2025 · Adopted on the General Consent ReportAfter work began$12K - Awards Deco Tech Systems $56,948 to install door intercom systems at 4 schoolsJun 4, 2025 ·
M.-2·25-1222· Jun 5, 2025 – Sep 3, 2025 · Adopted on the General Consent Report$57K - Awards Deco Tech Systems $79,000 to install door intercoms at five school sitesApr 23, 2025 ·
M.-4·25-0776· Apr 24, 2025 – Jul 23, 2025 · Adopted on the General Consent Report$79K - Awards Deco Tech Systems $59,000 to install door intercoms at five elementary schoolsApr 23, 2025 ·
M.-5·25-0777· Apr 24, 2025 – Jul 23, 2025 · Adopted on the General Consent Report$59K - Pays DecoTech Systems up to $8,160 to install camera software for the data center moveApr 9, 2025 ·
L.-5·25-0653· Apr 10, 2024 – May 30, 2025 · Adopted on the General Consent ReportAfter work beganText discrepancy$8Knot to exceed - Pays DecoTech Systems $43,313.33 for added network cabling at the 955 High Street officesJan 22, 2025 ·
M.-1·24-2735· Jan 23, 2025 – Apr 23, 2025 · Adopted on the General Consent Report$43K - Adds $16,268 to Deco Tech Systems' 900 High Street phone and data cabling jobJan 22, 2025 ·
M.-8·24-3149· Adopted on the General Consent ReportRaises existing contract+$16Knew total $112K - Pays DecoTech Systems $96,060 to install new data cabling at the 955 High Street buildingsAug 14, 2024 ·
T.-14·24-1736· Aug 15, 2024 – Nov 13, 2024 · Adopted on the General Consent Report$96K - Awards DecoTech Systems $173,500 to add and replace security cameras at Madison Park AcademyAug 14, 2024 ·
U.-7·24-1739· Aug 15, 2024 – Nov 13, 2024 · Adopted on the General Consent Report$174K - Awards DecoTech Systems $180,000 to add and replace security cameras at Urban Promise AcademyAug 14, 2024 ·
U.-8·24-1740· Aug 15, 2024 – Nov 13, 2024 · Adopted on the General Consent Report$180K - Awards Deco Tech Systems up to $473,500 for two years of security camera maintenance at various sitesAug 14, 2024 ·
U.-9·24-1748· Aug 15, 2024 – Aug 15, 2026 · Adopted on the General Consent ReportMulti-year$474Knot to exceed - Awards DecoTech Systems $140,500 to add and replace security cameras at Montera Middle SchoolAug 14, 2024 ·
U.-10·24-1761· Aug 15, 2024 – Nov 13, 2024 · Adopted on the General Consent Report$141K - Pays DecoTech Systems up to $33,660 for new data cabling at the 955 High Street officesJun 26, 2024 ·
U.-13·24-1529· Jun 27, 2024 – Oct 31, 2024 · Adopted on the General Consent Report$34Knot to exceed - Awards Deco Tech Systems $208,000 for new security cameras at Frick United Middle SchoolJun 5, 2024 ·
T.-3·24-1258· Jun 6, 2024 – Sep 4, 2024 · Adopted on the General Consent Report$208Knot to exceed - Hires Deco Tech Systems for up to $164,000 in new security cameras at Bret Harte Middle SchoolJun 5, 2024 ·
U.-3·24-1257· Jun 6, 2024 – Sep 4, 2024 · Adopted on the General Consent Report$164Knot to exceed - Hires Deco Tech Systems for up to $164,000 in new security cameras at Elmhurst Middle SchoolJun 5, 2024 ·
U.-4·24-1259· Jun 6, 2024 – Sep 4, 2024 · Adopted on the General Consent Report$164Knot to exceed - Adds $8,375.50 to Deco Tech Systems' Castlemont High security project for software and a server upgradeApr 10, 2024 ·
U.-3·24-0584· Adopted on the General Consent ReportRaises existing contract+$8Knew total $331K - Awards DecoTech Systems up to $147,400 to move the Cole data center to its new buildingApr 10, 2024 ·
U.-4·24-0586· Apr 11, 2024 – Apr 30, 2025 · Adopted on the General Consent Report$147Knot to exceed - Pays DecoTech Systems up to $23,771.49 for new security cameras at Community Day SchoolJan 10, 2024 ·
U.-3·23-2702· Jan 11, 2024 – Mar 15, 2024 · Adopted on the General Consent Report$24Knot to exceed - Adds $7,468.29 to DecoTech Systems' security camera contract at La Escuelita and Dewey AcademyJan 10, 2024 ·
U.-5·23-2735· Adopted on the General Consent ReportRaises existing contract+$7Knew total $199K - Awards DecoTech $128,500 to install and replace security cameras at Madison Park AcademyOct 25, 2023 ·
U.-3·23-2152· Oct 26, 2023 – Jan 23, 2024 · Adopted on the General Consent Report$129K - Adds $1,220.74 to DecoTech's camera security upgrade at La Escuelita and Dewey AcademyOct 11, 2023 ·
U.-3·23-2038· Adopted on the General Consent ReportRaises existing contract+$1Knew total $192K - Awards DecoTech Systems $211,000 to install and fix security cameras at Coliseum College PrepSep 13, 2023 ·
U.-1·23-1720· Sep 14, 2023 – Dec 12, 2023 · Adopted on the General Consent Report$211K - Awards DecoTech Systems $156,000 to install and fix security cameras at Ralph Bunche AcademySep 13, 2023 ·
U.-2·23-1721· Sep 14, 2023 – Dec 12, 2023 · Adopted on the General Consent Report$156K - Awards DecoTech Systems $203,500 to install and fix security cameras at Life Academy and United for SuccessSep 13, 2023 ·
U.-3·23-1735· Sep 14, 2023 – Dec 12, 2023 · Adopted on the General Consent Report$204K - Adds $9,999.13 to DecoTech's camera contract at Skyline High and Rudsdale, raising it to $240,081.08Sep 13, 2023 ·
U.-9·23-1790· Jan 26, 2023 – Sep 30, 2023 · Adopted on the General Consent ReportAfter work beganRaises existing contractText discrepancy+$10Knew total $240K - Change order adds $4,250 to DecoTech's door entry project at 900 High StreetSep 13, 2023 ·
U.-10·23-1791· Adopted on the General Consent ReportRaises existing contract+$4Knew total $54K - Pays Deco Tech Systems $49,882.99 to install door entry intercoms at 900 High StreetJun 21, 2023 ·
U.-4·23-1375· Jun 22, 2023 – Oct 3, 2023 · Adopted on the General Consent Report$50K - Adds $19,196.27 to Deco Tech's security camera work at Oakland International and Oakland TechJun 21, 2023 ·
U.-5·23-1376· Adopted on the General Consent ReportRaises existing contract+$19Knew total $215K - Adds $581.95 to Deco Tech's security work for video-capable phones at two high school sitesJun 21, 2023 ·
U.-6·23-1377· Adopted on the General Consent ReportRaises existing contract+$582new total $230K - Adds $8,000 to replace the security server at Oakland High SchoolJun 7, 2023 ·
U.-5·23-1295· Adopted on the General Consent ReportRaises existing contract+$8Knew total $255K - Awards DecoTech $190,500 to install and maintain security cameras at La Escuelita and Dewey AcademyMay 24, 2023 ·
U.-5·23-1037· May 25, 2023 – Aug 22, 2023 · Adopted on the General Consent Report$191K - Awards $323,000 to DecoTech Systems for new security cameras at Castlemont HighApr 26, 2023 ·
U.-2·23-0815· Apr 27, 2023 – Jul 25, 2023 · Adopted on the General Consent Report$323K - Adds $6,082.52 to replace 7 analog cameras with network cameras at Oakland High SchoolApr 12, 2023 ·
U.-5·23-0553· Adopted on the General Consent ReportRaises existing contract+$6Knew total $247K - Awards DecoTech $229,500 to install and replace security cameras at Skyline High and Rudsdale/Sojourner TruthJan 25, 2023 ·
U.-3·22-2842· Jan 26, 2023 – Apr 25, 2023 · Adopted on the General Consent Report$230K - Awards Deco Tech Systems $240,500 for new security cameras and door intercoms at Oakland HighJan 17, 2023 ·
J.-6·22-2819· Jan 18, 2023 – Apr 17, 2023 · Adopted on the General Consent ReportDelayed at earlier meeting$241K - Pays DecoTech Systems $19,089.31 for security camera upgrades at Skyline High SchoolNov 30, 2022 ·
T.-3·22-2546· Dec 1, 2022 – Feb 28, 2023 · Adopted on the General Consent Report$19K - Awards DecoTech Systems $100,178.60 to install security cameras at Edna Brewer Middle SchoolOct 26, 2022 ·
T.-2·22-2240· Oct 27, 2022 – Dec 25, 2022 · Adopted on the General Consent Report$100K - Approves $5,852 for DecoTech to install data cabling at Madison Middle SchoolMay 25, 2022 ·
V1.-3·22-1097· Apr 29, 2022 – Jun 30, 2022 · Adopted on the General Consent ReportAfter work began$6K - Hires Deco Tech Systems for $95,000 of low-voltage and audio-visual work at McClymonds siteDec 11, 2019 ·
P.-18·19-2371· Dec 12, 2019 – Dec 11, 2020 · Adopted on the General Consent Report$95K
Other consent appearances (1)
Earlier appearances of items decided at a later meeting, and items not adopted or not yet acted on. These aren't counted in the totals above.
- Awards Deco Tech Systems $240,500 for new security cameras and door intercoms at Oakland HighJan 11, 2023 ·
U.-6· Adopted on the General Consent Report, Jan 17, 2023$241K
All Legistar records (56)
Every Legistar record carrying this vendor number in any year, on consent or not, plus records Legistar links to this vendor's consent items (for example, an amendment's original agreement). Newest first.
| Date | File | Official title | Type | Status |
|---|---|---|---|---|
| Sep 9, 2026 | 26-1713 | Change Order No. 2, Agreement for Maintenance - Deco Tech Systems, Inc. – Various Sites Security Camera Maintenance Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 26-1486 · Related: 24-1748, 26-0445 · Plain-English summary | Agreement or Contract | Passed |
| Sep 9, 2026 | 26-1677 | Agreement Between Owner and Contractor – Deco Tech Systems, Inc. – Lincoln Elementary School Security Improvement Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 26-1483 · Plain-English summary | Agreement or Contract | Passed |
| May 13, 2026 | 26-0829 | Agreement Between Owner and Contractor – Deco Tech Systems, Inc. – Various Sites Door Entry Systems Upgrades Group 1 Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 26-0884 · Plain-English summary | Motion | Passed |
| Apr 22, 2026 | 26-0720 | Agreement Between Owner and Contractor – Deco Tech Systems, Inc. – Various Sites Door Entry Systems Upgrades Group 1 Project- Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 26-0682 · Plain-English summary | Motion | Passed |
| Mar 25, 2026 | 26-0445 | Change Order No. 1, Agreement for Maintenance – Deco Tech Systems, Inc. – Various Sites Security Camera Maintenance Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 26-0544 · Related: 24-1748, 26-1713 · Plain-English summary | Agreement or Contract | Passed |
| Feb 25, 2026 | 26-0120 | Agreement Between Owner and Contractor – Deco Tech Systems, Inc. – Acorn Woodland & Encompass School Security Improvement Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 26-0340 · Plain-English summary | Agreement or Contract | Passed |
| Jan 14, 2026 | 25-2902 | Agreement Between Owner and Contractor - DecoTech Systems, Inc., - Division of Facilities and Planning ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 26-0089 · Plain-English summary | Agreement or Contract | Passed |
| Dec 10, 2025 | 25-2691 | Change Order No. 1, Agreement Between Owner and Contractor – Deco Tech Systems, Inc. – Various Sites Door Entry Systems Upgrades Group 3 Project- Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-2113 · Related: 25-1222 · Plain-English summary | Agreement or Contract | Passed |
| Nov 12, 2025 | 25-2406 | Change Order No. 1, Agreement Between Owner and Contractor – Deco Tech Systems – Laurel Child Development Center Security Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-1916 · Related: 25-1720 · Plain-English summary | Agreement or Contract | Passed |
| Oct 22, 2025 | 25-2338 | Construction Agreement Between Owner and Contractor – DecoTech Systems, Inc. – Lockwood Network Infrastructure Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-1823 · Plain-English summary | Agreement or Contract | Passed |
| Aug 27, 2025 | 25-1961 | Construction Agreement Between Owner and Contractor – Deco Tech Systems, Inc. – La Escuelita Elementary School Camera Additions Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-1456 · Plain-English summary | Agreement or Contract | Passed |
| Aug 27, 2025 | 25-1891 | Purchase Agreement – DecoTech Systems, Inc. – CalShape Ventilation Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-1454 · Plain-English summary | Agreement or Contract | Passed |
| Aug 27, 2025 | 25-1739 | Amendment No. 3, Grant Agreement - City of Oakland - Newcomer Wellness and Peer Restorative Justice - Community Schools and Student Services DepartmentChief Academic Officer · Enactment no. 25-1405 · Related: 24-1739 | Agreement or Contract | Passed |
| Aug 13, 2025 | 25-1720 | Construction Agreement Between Owner and Contractor – DecoTech Systems, Inc. – Laurel Child Development Center Security Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-1365 · Related: 25-2406 · Plain-English summary | Agreement or Contract | Passed |
| Aug 13, 2025 | 25-1719 | Agreement Between Owner and Contractor - DecoTech Systems, Inc. - Brookfield Elementary School Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-1364 · Plain-English summary | Agreement or Contract | Passed |
| Aug 13, 2025 | 25-1679 | Agreement Between Owner and Contractor – DecoTech Systems, Inc. – Franklin Elementary School Security Improvement Project- Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-1359 · Plain-English summary | Agreement or Contract | Passed |
| Jun 4, 2025 | 25-1222 | Agreement Between Owner and Contractor – Deco Tech Systems, Inc. – Various Sites Door Entry Systems Upgrades Group 3 Project- Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-0977 · Related: 25-2691 · Plain-English summary | Agreement or Contract | Passed |
| Apr 23, 2025 | 25-0777 | Agreement Between Owner and Contractor - Deco Tech Systems, Inc. - Various Sites Door Entry Systems Upgrades Group 2 Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-0586 · Plain-English summary | Agreement or Contract | Passed |
| Apr 23, 2025 | 25-0776 | Agreement Between Owner and Contractor – Deco Tech Systems, Inc. - Various Sites Door Entry Systems Upgrades Group 1 Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-0585 · Plain-English summary | Agreement or Contract | Passed |
| Apr 9, 2025 | 25-0653 | General Services Agreement - DecoTech Systems, Inc. - The Data Center Relocation Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 25-0441 · Plain-English summary | Agreement or Contract | Passed |
| Jan 22, 2025 | 24-3149 | Change Order No. 1, Agreement Between Owner and Contractor – DecoTech Systems – 900 High Street VOIP Cabling Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-2474 · Related: 24-1736 · Plain-English summary | Agreement or Contract | Passed |
| Jan 22, 2025 | 24-2735 | Agreement Between Owner and Contractor – DecoTech Systems, Inc. – 955 High Street VOIP Cabling Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-2467 · Plain-English summary | Agreement or Contract | Passed |
| Aug 14, 2024 | 24-1761 | Agreement Between Owner and Contractor – DecoTech Systems, Inc.- Montera Middle School Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-1501 · Plain-English summary | Agreement or Contract | Passed |
| Aug 14, 2024 | 24-1748 | Agreement for Maintenance – Deco Tech Systems, Inc. – Various Sites Security Camera Maintenance Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-1500 · Related: 26-0445, 26-1713 · Plain-English summary | Agreement or Contract | Passed |
| Aug 14, 2024 | 24-1740 | Agreement Between Owner and Contractor - DecoTech Systems, Inc. - Urban Promise Academy Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-1499 · Plain-English summary | Agreement or Contract | Passed |
| Aug 14, 2024 | 24-1739 | Agreement Between Owner and Contractor - DecoTech Systems, Inc. - Madison Park Academy Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-1498 · Related: 25-1739 · Plain-English summary | Agreement or Contract | Passed |
| Aug 14, 2024 | 24-1736 | Agreement Between Owner and Contractor - DecoTech Systems - 955 High Street VOIP Cabling Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-1379 · Related: 24-3149 · Plain-English summary | Agreement or Contract | Passed |
| Jun 26, 2024 | 24-1529 | Agreement Between Owner and Contractor – DecoTech Systems – 955 High Street VOIP Cabling Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-1352 · Plain-English summary | Agreement or Contract | Passed |
| Jun 5, 2024 | 24-1259 | Agreement Between Owner and Contractor – Deco Tech Systems, Inc. – Elmhurst Middle School Security Improvement Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-1198 · Plain-English summary | Agreement or Contract | Passed |
| Jun 5, 2024 | 24-1258 | Agreement Between Owner and Contractor – Deco Tech Systems, Inc. – Frick United Middle School Security Improvement Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-1133 · Plain-English summary | Agreement or Contract | Passed |
| Jun 5, 2024 | 24-1257 | Agreement Between Owner and Contractor – Deco Tech Systems, Inc. – Bret Harte Middle School Security Improvement Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-1197 · Plain-English summary | Agreement or Contract | Passed |
| Apr 10, 2024 | 24-0586 | Agreement Between Owner and Contractor – DecoTech Systems, Inc. - Cole Data Center Relocation Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-0652 · Plain-English summary | Agreement or Contract | Passed |
| Apr 10, 2024 | 24-0584 | Change Order No. 1, Agreement Between Owner and Contractor - Deco Tech Systems - Castlemont High School Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-0651 · Related: 23-0815 · Plain-English summary | Agreement or Contract | Passed |
| Jan 10, 2024 | 23-2735 | Change Order No. 2, Agreement Between Owner and Contractor – DecoTech Systems – La Escuellita Education Center and Dewey Academy Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-0084 · Related: 23-1037, 23-2038 · Plain-English summary | Agreement or Contract | Passed |
| Jan 10, 2024 | 23-2702 | Construction Agreement Between Owner and Contractor – DecoTech Systems – Community Day School Security Improvements Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 24-0082 · Plain-English summary | Agreement or Contract | Passed |
| Oct 25, 2023 | 23-2152 | Agreement Between Owner and Contractor – DecoTech Systems, Inc. – Madison Park Academy Primary Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1908 · Plain-English summary | Agreement or Contract | Passed |
| Oct 11, 2023 | 23-2038 | Change Order No. 1, Agreement Between Owner and Contractor – DecoTech Systems – La Escuellita Education Center and Dewey Academy Security Improvement - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1777 · Related: 23-2735 · Plain-English summary | Agreement or Contract | Passed |
| Sep 13, 2023 | 23-1791 | 23-1615Change Order No. 1, Agreement Between Owner and Contractor - DecoTech Systems - 900 High Street Door Entry Systems Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1615 · Plain-English summary | Agreement or Contract | Passed |
| Sep 13, 2023 | 23-1790 | Change Order No. 2, Agreement Between Owner and Contractor – DecoTech Systems – Skyline High School & Rudsdale Sojourner Truth Security Improvements Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1614 · Plain-English summary | Agreement or Contract | Passed |
| Sep 13, 2023 | 23-1735 | Agreement Between Owner and Contractor – DecoTech Systems, Inc. – Life Academy & United for Success Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1608 · Plain-English summary | Agreement or Contract | Passed |
| Sep 13, 2023 | 23-1721 | Agreement Between Owner and Contractor – DecoTech Systems, Inc. – Ralph Bunche Academy at West Oakland Middle School Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1607 · Plain-English summary | Agreement or Contract | Passed |
| Sep 13, 2023 | 23-1720 | Agreement Between Owner and Contractor – DecoTech Systems, Inc. – Coliseum College Preparatory Academy Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1606 · Plain-English summary | Agreement or Contract | Passed |
| Jun 21, 2023 | 23-1377 | Change Order No. 1, Agreement Between Owner and Contractor – Deco Tech Systems – Rudsdale/Sojourner Truth and Skyline High School Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1238 · Plain-English summary | Agreement or Contract | Passed |
| Jun 21, 2023 | 23-1376 | Change Order No. 1, Agreement Between Owner and Contractor – Deco Tech Systems – Oakland International High School and Oakland Technical High School Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1237 · Related: 22-2832 · Plain-English summary | Agreement or Contract | Passed |
| Jun 21, 2023 | 23-1375 | Agreement Between Owner and Contractor – Deco Tech Systems – 900 High Street Door Entry Systems Project – Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1236 · Plain-English summary | Agreement or Contract | Passed |
| Jun 7, 2023 | 23-1295 | Change Order No. 2, Agreement Between Owner and Contractor – Deco Tech Systems – Oakland High School Security Improvements Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1140 · Related: 22-2819, 23-0553 · Plain-English summary | Agreement or Contract | Passed |
| May 24, 2023 | 23-1037 | Agreement Between Owner and Contractor – DecoTech Systems, Inc. - La Escuelita Educational Complex and Dewey Academy School Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-1054 · Related: 23-2735 · Plain-English summary | Agreement or Contract | Passed |
| Apr 26, 2023 | 23-0815 | Agreement Between Owner and Contractor – DecoTech Systems, Inc. Castlemont High School Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-0775 · Related: 24-0584 · Plain-English summary | Agreement or Contract | Passed |
| Apr 12, 2023 | 23-0553 | Change Order No. 1, Agreement Between Owner and Contractor – Deco Tech Systems – Oakland High School Security Improvements Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-0662 · Related: 22-2819, 23-1295 · Plain-English summary | Agreement or Contract | Passed |
| Feb 22, 2023 | 22-2832 | Agreement Between Owner and Contractor – Deco Tech Systems – Oakland Technical High School and Oakland International High School Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-0285 · Related: 23-1376 | Agreement or Contract | Passed |
| Jan 25, 2023 | 22-2842 | Agreement Between Owner and Contractor – Deco Tech Systems – Skyline High School /Rudsdale Sojourner Truth Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-0182 · Plain-English summary | Agreement or Contract | Passed |
| Jan 17, 2023 | 22-2819 | Agreement Between Owner and Contractor – Deco Tech Systems – Oakland High School Security Improvement Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 23-0149 · Related: 23-0553, 23-1295 · Plain-English summary | Agreement or Contract | Passed |
| Nov 30, 2022 | 22-2546 | Construction Agreement Between Owner and Contractor – DecoTech Systems – Skyline High School Expansion Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 22-2060 · Plain-English summary | Agreement or Contract | Passed |
| Oct 26, 2022 | 22-2240 | Agreement Between Owner and Contractor – Competitively Bid – DecoTech Systems – Edna Brewer Middle School Video Surveillance Camera Installation Project - Division of Facilities Planning and ManagementChief Academic Officer · Enactment no. 22-1852 · Plain-English summary | Agreement or Contract | Passed |
| May 25, 2022 | 22-1097 | Construction Agreement Between Owner and Contractor – DecoTech Systems – Madison Middle School Expansion Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 22-1011 · Plain-English summary | Agreement or Contract | Passed |
| Dec 11, 2019 | 19-2371 | Agreement Between Owner and Contractor - Deco Tech Systems - McClymonds Intensive Support Site Project - Division of Facilities Planning and ManagementDeputy Chief, Facilities Planning and Management · Enactment no. 19-1779 · Plain-English summary | Agreement or Contract | Passed |